Key Information

Stand Specification 

Please Click Here to view the General Shell Specification 

Stand Visual

Please Click Here to view the Shell Scheme Visual for HT360

Checklist

Are you show ready? Follow this guide to ensure you have completed everything you need to exhibit

SHELL SCHEME STAND REGULATIONS & INFORMATION

A shell scheme stand is one that the Organiser’s contractor, Creative Live, will build on your behalf. Please contact ops.iha@montgomerygroup.com for your specific timetable which will confirm when your stand is ready for interior decoration and delivery of products. They include:

  • Walls – number will depend on whether the stand is one, two or three sides open. This information can be found on your contract.  If you would like to double check this, please contact the organisers.
  • Flooring – anthracite (grey) cord carpet. If you would like to change the colour of your flooring, there will be an additional cost for this.  If you would like to provide your own floorcovering, please contact the organisers. No refund will be given if you decide to supply your own floorcovering.
  • Fascia and company nameboard.  Your company name will be displayed as that detailed on your contract.
  • Fingerboard.

 

Dependent on your shell type/ package your stand may also include:

  • Lighting
  • Electrical Socket
  • Furniture Package

 

To check if your stand type/ package includes the above extras, please check your contract, and read your stand type’s full specifications (linked below). If you are unsure of your stand type, please contact organisers to clarify.

 

Additional items such as electrics, shelves, storage areas or worktops can be ordered from Creative Live.

 Creative Live

T: 

E: 

W: 

ELECTRICAL REGULATIONS & INFORMATION

The electrical contractor is Creative Live who is responsible for and will carry out all electrical work on stands within the exhibition halls.

Creative Live
T: 
E: 

W: 

 

Lighting and Electrical Socket Packages


Check the full specification for your stand type to see what (if any) electrical packages you have included.

If you require any/additional lights or sockets, please place your orders through Creative Live. Orders must be made by Wednesday 25th February to avoid surcharges.

 

 

Basic guidelines For Socket Sizes and Usage
 

Listed below are examples of "typical" loadings for items plugged in to socket outlets:

500 watt sockets:             computers, TV’s, video’s, spotlights to 500W, refrigerators
1000 watt sockets:          domestic filter coffee machines, lighting up to 1000W
2000 watt sockets:          kettles**, machinery up to 2000W
3000 watt sockets:          hired coffee machines, machinery 2000W to 3000W

Note ** kettles and refrigeration / freezer requirements vary between 200 and 2000 watts.  Please check with the supplier or check the reference tag or plate on the machine.

If you have any questions about the exact electrical requirements for your stand, please contact the electrical contractor using the details above who will be happy to advise you. 

Regulations and Requirements

E-guide Regulations

  • Multi-way plug in type and bayonet adapters shall not be used
  • The use of trailing/Block type 4-way fused sockets shall be restricted to the following: one 4-way lead per fixed socket outlet, subject to a maximum loading of 500 watts total and its plug shall be fused accordingly
  • A maximum flexible cord length of 2 metres from plug to trailing block unit
  •  It is the owner or user’s responsibility to ensure that portable appliances are safe to be plugged into the electrical system
  • The use of batteries to provide mains stand power is strictly prohibited, as batteries are not currently considered to be a safe source of power. This is primarily due to the concern of being unable to identify power sources clearly within a stand and therefore to isolate power in case of a fire, as well as concerns over defects due to lack of maintenance and poor transportation and storage.


Examples of Power Requirements

2amp (500w) Socket - Laptops, Computers, TV’s, DVD’s, Lighting up to 500w

5amp (1000w) Socket - Small Domestic Microwaves, Lighting up to 1000w

10amp (2000w) Socket - Small Nespresso Machines, Small Vacuum Cleaner, Hair Dryers. Lighting not permitted

13amp (3000w) Socket - Vacuum Cleaner, Coffee machines, Jug Kettles, Urns. Lighting not permitted

Note: Lighting circuits may not exceed 1000w

This is for guidance only. We recommend that you check the rating plate of your appliances so that you are 100% correct when you place your order.
 

Guidlines

Deadline date

UPDATE
Early Bird – orders placed before Wednesday 25th February 2026

Standard Rate – orders places between Wednesday 25th February 2026 to Sunday 15th March 2026 (20% on early bird rate)

Surcharge rate (includes onsite rate order) - orders placed from Sunday 15th March 2026 (20% on standard rate)

Enquiry desk

During the build-up period, an enquiry desk will be located outside the Organisers Office (N4) to assist exhibitors with any electrical queries or problems. The desk will be manned from 0800-1800 hours daily

Supply Timetable

Electricity will be energised to stands as quickly as possible during the build-up period, subject to satisfactory inspection and testing of installations. 

From the time your sockets are energized they will remain on until 6pm each evening. On the final day of the show the power will be turned off 15 minutes after the show closes.

Any exhibitor needing electricity for the running down of machinery or refrigeration equipment etc. when the exhibition closes at 1700hrs on Wednesday 7th April, must inform the Organiser’s Office of their requirements no later than 1700hrs the day before (Tuesday 6th April), for this to be arranged in time.

Sustainability & Waste

We ask our exhibitors to be mindful of their impact whilst exhibiting with us. Waste is unfortunately inevitable; however, we can all certainly do a lot more to reduce waste.

Exhibitors are responsible for the waste created in the building, decorating, and dismantling of their stands.

Any waste created must be planned for. Waste created during build up is just as important to plan as for breakdown. Should the waste not be able to be taken away daily, then pre book the waste bins/skips required for the waste.

One of these two options will be far cheaper then booking waste bins/skips onsite or worst will be us as organisers having to charge the exhibitor the waste bin charge (price dependent on the amount of waste) PLUS a fixed fine of £300.

For more information, please click here.  To order your waste bins now, click here. 

Access

ExCeL is adopting the Voyage Control pre-show vehicle booking system for deliveries to the show floor to ensure clarity in terms of access and to reduce waiting times.

For a seamless process, it is essential that all vehicles needing access the venue’s loading bays are pre-booked on the ExCeL London Vehicle Booking System.  

To book your vehicle please go to excellondon.voyagecontrol.com. Voyage Control will go live 21 days prior to the event.

Any exhibitor or contractor vehicles that are not booked system will be denied access to the loading bay by the on-site traffic team.

Links to Shell Visuals